I advise of some impending utility works on Hindhead Road, at the Junctions with Tilford Road, Portsmouth Road, London Road Hindhead.
The works are using off peak multi-way temporary signals
These works are being carried out by BT and are to gain safe access to underground BT footway and carriageway boxes for fibre cabling and jointing work in existing duct. This is required for a new customer connection.
These works are due to take place from for the 28/01/16 for approximately 1 day.